Hope High School Cupola

Atlas thrives on complex jobs like the cupola at Hope High School
The scaffolding was engineered with 11 platforms to allow access to every part of the cupola
After the scaffolding was erected, debris netting was installed to catch any stray material
A view of the stairs that provided access to the different levels
A debris chute was installed to safely move waste off the jobsite

FACILITY:
Hope High School

LOCATION:
Providence, RI